INSTALLATION / STEP BY STEP

What happens on installation day?

Know what to expect from first survey to the final trowel. A successful finish starts with preparation long before the decorative aggregate arrives.

1. Site visit and agreed scope

The first stage is understanding the existing driveway: its surface, dimensions, access, levels, intended traffic and where rainwater needs to travel. The specification should be chosen for the actual ground conditions rather than a standard price per square metre.

2. Removal and preparation, when needed

For a complete replacement, existing materials are broken out and removed, levels are set and the ground is prepared for the specified construction. Excavation depth and disposal volumes depend on what's beneath the surface; they should never be guessed from the finished resin thickness alone.

Excavation of broken concrete with an excavator
Real groundworks photograph showing why preparation and waste handling need to be allowed for in a full rebuild.

3. Base construction and water management

A driveway typically needs a sound, correctly compacted base that suits the chosen resin-bound system and loading. The base design may involve permeable sub-base materials, structural bound layers or other approved construction details. Falls, outfalls, drainage channels and thresholds need planning at this stage.

Why the base matters

Any surface is only as good as its preparation. Cracks, subsidence and ponding can often be traced back to conditions underneath the top layer.

4. Edges, samples and the final design

Before the final surface goes down, the edge restraint, colour blend, border choice and transitions at gates or footpaths should be agreed. We offer both Vuba and Resin Mill finish ideas, with final colours confirmed against physical samples.

5. Mixing, laying and finishing

The installer measures and mixes aggregate with the specified resin binder in accordance with the manufacturer's instructions, lays it at the designed depth and trowels it to an even finish. Work planning needs to take temperature, rain risk, working time and crew size into account. Working time and cure times differ between products and weather conditions.

6. Protecting the surface while it cures

Fresh resin should be kept free from foot and vehicle traffic until the actual system's approved cure time has passed. Ask for a clear handover covering traffic, cleaning, routine care and what to do if damage occurs. Never assume that one generic ‘24-hour’ rule fits every resin and weather condition.

How long does the work take?

A straightforward overlay and a full excavation-and-rebuild are very different jobs. Time depends on the driveway size, curing requirements, access, groundworks, weather and drainage. We discuss a realistic sequence after inspecting your property.